London

Allume Energy UK

Allume Energy UK develops innovative shared solar technology, enabling apartment buildings to access and share rooftop solar power, making solar energy affordable and accessible.
★★★★★  
5
👥
9
Reviews
🏆Elite+ Installer

About

Allume Energy UK is part of Allume Energy, an international renewable energy technology company dedicated to delivering innovative solar solutions that make clean energy accessible to all. Founded in Australia, Allume expanded into the UK market with its groundbreaking SolShare technology, the world’s only hardware that allows multiple flats within the same building to share a single rooftop solar PV system.

By tackling one of the biggest challenges in the solar industry—delivering solar power to apartments and multi-dwelling buildings—Allume Energy UK enables landlords, housing associations, and residents to reduce energy bills while contributing to a greener, more sustainable future. Their mission is to make rooftop solar affordable and inclusive, regardless of property type, and their vision is to lead the way in solar access for communities traditionally excluded from renewable energy opportunities.

Allume Energy UK works with housing providers, councils, and developers to integrate shared solar technology into residential and community projects. With award-winning innovation, customer focus, and dedication to sustainability, Allume Energy UK is at the forefront of transforming how solar energy is delivered in urban environments.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Shared solar solutions for apartment buildings

✔️ Solar PV integration for housing associations

✔️ Community solar projects

✔️ Battery storage integration with SolShare

✔️ Partnerships with councils and developers

✔️ Energy consultancy and project planning

✔️ Ongoing monitoring and support services

Products & Manufacturers

Allume Energy UK delivers its unique SolShare technology, alongside solar and storage products from trusted manufacturers:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower
  • Inverters: SolarEdge, SMA, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen

SolShare Device: Allume’s proprietary technology enabling shared solar access

Project Gallery

Contact Information

26 Store St, London WC1E 7BT, United Kingdom
442081560131
uk.info@allumeenergy.com

Service Areas

London

Certifications

Allume Energy UK collaborates with certified solar installers and is aligned with industry standards, including:

  • MCS (Microgeneration Certification Scheme) – ensuring high-quality solar installations.
  • NICEIC – electrical compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection and ethical trading.

ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Allume Energy UK works with accredited partners to provide standard warranty coverage:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years (through installation partners).
  • SolShare technology – covered under product-specific warranties.

Company Details

Languages Spoken

English

Years in Business

Over 7 years globally (UK operations active in recent years)

Projects Completed

Hundreds of shared solar projects worldwide, with growing adoption in the UK

Customer Reviews

Read what our customers have to say about their experience with Allume Energy UK Solar Solutions

Recently installed 5 x Solshare units for the first time. Physical installation was great, pretty self explanatory but I did look at the booklet afterwards and thought it was great. Training provided online pre installation was enough to understand the concept and installation, which is brilliant. Technical support with Nick and his colleagues was fantastic. Called a couple of times during commissioning and they were able to provide the help/information that I required.

Dan Keen

Channel Electrical Systems have recently installed 2 full Solshare Systems and are currently on our 3rd Solshare project, working with a fantastic team at Allume Energy. Special mention to Nick Williams for the fantastic technical support.

Alun Lewis

I had an outstanding experience with Allume/ Solshare. From the moment we reached out, Nick is responsive, friendly, and genuinely eager to help. When we encountered a technical issue, the staff walked me through every step patiently and professionally. They resolved the problem quickly and followed up to ensure everything was working perfectly. It's rare to find such a high level of care and expertise—truly top-notch service! Highly recommended

Clark Gourlay

Frequently Asked Questions

How does Allume Energy UK work?

Allume Energy offers the innovative SolShare technology, which allows residents in apartments and multi-tenant buildings to share one rooftop solar system.

What areas does Allume Energy UK serve?

They operate across the UK, bringing affordable solar solutions to shared housing and community properties.

How eco-friendly are Allume Energy UK’s solar solutions?

Their technology reduces reliance on fossil fuels, cutting energy costs and carbon emissions for multiple households at once.

Get a Free Solar Quote

Interested in Allume Energy UK? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.