Liverpool

Alliance Energy Solutions Ltd

Alliance Energy Solutions Ltd provides renewable energy design, installation and maintenance, bringing clean energy to diverse sectors.
★★★★★  
5
👥
14
Reviews
🏆Elite+ Installer

About

Alliance Energy Solutions Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and sustainable energy solutions for homes and businesses. With a strong focus on quality, affordability, and customer satisfaction, the company delivers tailored renewable energy systems designed to reduce bills, improve energy independence, and support the UK’s transition to a low-carbon future.

The mission of Alliance Energy Solutions Ltd is to make clean energy simple, efficient, and accessible to everyone. Their vision is to empower households and organizations with advanced solar and energy storage technologies that provide long-term reliability, performance, and environmental benefits.

With a professional team of engineers and renewable specialists, the company provides end-to-end services from consultation and system design to installation and aftercare. Known for its transparent service and customer-first approach, Alliance Energy Solutions Ltd has built a reputation for professionalism, technical expertise, and sustainable innovation across the UK.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar energy systems

✔️ Battery storage solutions

✔️ EV charging point installations

✔️ Solar servicing and maintenance

✔️ Energy audits and consultation

✔️ Financing and renewable support options

Products & Manufacturers

Alliance Energy Solutions Ltd partners with leading renewable energy manufacturers to ensure reliable system performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

660 Aigburth Rd, Liverpool L19 0NY, United Kingdom
44 151 319 3900
webenquiry@allianceenergysolutions.co.uk

Service Areas

Liverpool

Certifications

Alliance Energy Solutions Ltd operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV systems.
  • NICEIC – compliance with electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – fair consumer practices and protection.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

Alliance Energy Solutions Ltd provides warranty coverage consistent with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy industry experience

Projects Completed

Dozens of residential and commercial solar projects successfully delivered across the UK

Customer Reviews

Read what our customers have to say about their experience with Alliance Energy Solutions Ltd Solar Solutions

We needed to replace our old boiler and Alliance Energy was recommended. We could not have done any better, they were excellent! Friendly, knowledgeable, and professional. We were reassured by everything they did, that the installation would be completed, at a reasonable price, on time, and to a high standard. It was! We cannot recommend them highly enough.

Mark H

I wanted to share my experience with others. Thanks to Alliance for installing my new boiler. I had zero problems throughout my dealings with them. I first saw the Alliance shop whilst driving along Aigburth Road as I was thinking it's time for a new boiler. I made a phone call to the shop & within a few hours received a call back from the engineer. A quick visit & a great quote was given.

Pete Mercedes

Quality work from Nicky and Liam, would highly recommend them.Both clearly knowledgable with loads of experience, also extremely polite, tidy and respectful of their surroundings when working.

Matthew Clark

Frequently Asked Questions

How long has Alliance Energy Solutions been operating?

I did not find a publicly available incorporation or founding date in my search.

Does Alliance Energy Solutions offer free quotes or consultations?

Their website does not explicitly mention free quotes — contacting them would clarify.

What types of solar panels do they use?

I could not verify specific panel brands; many UK installers use Tier-1 solar panel manufacturers, but you'd need to ask the company for their product list.

Get a Free Solar Quote

Interested in Alliance Energy Solutions Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.