Leicester

Airtech Renewables Ltd

Airtech Renewables focuses on solar installation, energy auditing and system integration, delivering reliable and cost-effective clean energy services.
★★★★★  
5
👥
9
Reviews
🏆Elite+ Installer

About

Airtech Renewables Ltd is a UK-based renewable energy company delivering high-quality solar PV systems, battery storage, and sustainable energy solutions for both residential and commercial clients. With a strong focus on innovation, reliability, and customer satisfaction, the company has built a reputation for helping households and businesses cut energy costs, reduce their carbon footprint, and achieve energy independence.

The mission of Airtech Renewables Ltd is to provide affordable, efficient, and future-ready renewable technologies that support the UK’s transition to net zero. Their vision is to empower communities to embrace clean energy and sustainable living by delivering bespoke systems tailored to individual needs.

With a skilled team of renewable energy specialists and engineers, the company provides complete end-to-end services, from consultation and system design through to installation, testing, and ongoing aftercare. Airtech Renewables Ltd combines technical expertise with a customer-first approach, ensuring every project is completed to the highest standards of safety, quality, and performance.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar panel servicing and maintenance

✔️ Energy audits and consultation

✔️ Flexible financing and renewable support options

Products & Manufacturers

Airtech Renewables Ltd works with trusted renewable manufacturers to ensure long-lasting system performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

44 7501 000744
info@airtechrenewables.co.uk

Service Areas

Leicester

Certifications

Airtech Renewables Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – compliance with UK electrical safety regulations.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

Airtech Renewables Ltd offers warranty coverage aligned with UK solar industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of operation in the UK renewable energy sector

Projects Completed

Dozens of residential and commercial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with Airtech Renewables Ltd Solar Solutions

Frequently Asked Questions

What services does Airtech Renewables offer?

(Public info limited) Likely they provide solar / renewable installations and related services; further detail would require visiting their site or contacting them.

Does Airtech Renewables offer maintenance or after-sales support?

No definitive public info; typical industry practice is to offer monitoring and maintenance, but you should confirm directly.

What warranties are offered by Airtech Renewables?

No clear warranty terms found publicly — ask for panel, inverter, and workmanship warranties before proceeding.

Get a Free Solar Quote

Interested in Airtech Renewables Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.