London

ACEN Solar

ACEN Solar is a global renewable energy company investing in large-scale solar power projects, advancing clean power and sustainable energy growth across Asia Pacific.
★★★★★  
5
👥
41
Reviews
🏆Elite+ Installer

About

ACEN Solar is a UK-based renewable energy provider specializing in solar PV system design, installation, and maintenance. With a strong commitment to sustainability, the company focuses on delivering efficient and affordable clean energy solutions for both residential and commercial clients. By combining innovation with practical expertise, ACEN Solar helps homeowners and businesses lower energy costs, reduce reliance on fossil fuels, and achieve long-term energy independence.

ACEN Solar’s mission is to accelerate the transition to renewable energy by making solar technology accessible and reliable. Their team of skilled engineers and installers bring years of industry experience, ensuring each project is completed to the highest quality standards. Known for its customer-focused approach, ACEN Solar provides personalized system designs tailored to individual energy needs while maintaining full compliance with UK regulations and best practices.

With high ratings for product quality, installation service, and overall customer experience, ACEN Solar has built a solid reputation in the renewable energy market. By offering complete solar and battery storage packages, the company plays an important role in supporting the UK’s drive toward net zero and a greener future.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar energy systems

✔️ Battery storage system installation

✔️ EV charging station setup

✔️ Solar system maintenance and repairs

✔️ Energy efficiency audits and consultation

✔️ Flexible financing and grant support

Products & Manufacturers

ACEN Solar partners with trusted and widely used solar manufacturers in the UK market, including:

  • Solar Panels: Trina Solar, Q CELLS, JA Solar, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

44 Broadway, London E15 1XH, United Kingdom
442030053282
info@acen-solar.co.uk

Service Areas

London

Certifications

ACEN Solar operates in line with recognized UK industry standards and is likely to hold the following certifications:

  • MCS (Microgeneration Certification Scheme) – assurance of product and installation quality.
  • NICEIC – compliance with electrical standards.
  • RECC (Renewable Energy Consumer Code) – consumer protection and fair trading.
  • ISO 9001/14001 – quality and environmental management (where applicable).

Warranty Information

ACEN Solar offers warranties consistent with UK solar industry standards:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years installation coverage.
  • Battery storage – 5–10 years depending on the manufacturer.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in the UK renewable energy sector

Projects Completed

Hundreds of residential and commercial solar projects successfully delivered

Customer Reviews

Read what our customers have to say about their experience with ACEN Solar Solar Solutions

High satisfactory installation work. Attention to detail, dedication, knowledge, responsiveness, everything that a customer looks for exceeded my expectations. A standard rarely seen in other similar companies. Strongly recommend ACEN Solar.

Lequn Su

Acen Solar did a fantastic job on my Solar install. I had got quite a few different quotes and was finding a lot of companies were overpriced and inflexible. Aras was the complete opposite and I found him down to earth, helpful and willing to work with me to provide the equipment and install I was looking for. The quote was also itemised in terms of equipment / labour/ scaffolding which incredibly no other company seems to provide. Aras came round to do a survey within a few days and had the job done about 2 weeks later. I ended up fitting 14 panels which far exceeded my expectations in terms of generation and I’m over the moon about it. All documentation and MCS certificate was provided a few weeks after which was longer than I expected but understand there is a wait for DNO.

Laurie Robinson

Having undertaken a fair bit of research and looking for a local installer I came across Acen Solar. Aras spent much time with me going through a few iterations with my constant questions he was very patient and was always very helpful to draw up proposals, eventually settling on a optimum configuration. He and his team did the install within a week. System is now up and running and exports also setup and I'm definitely seeing a return on my investment.

Naveed Bashir

Frequently Asked Questions

What areas does ACEN Solar serve?

ACEN Solar provides solar panel installation services across London and nearby regions, focusing on residential and commercial properties.

Does ACEN Solar help with government incentives or grants?

Yes, they guide customers through available government schemes and incentives to maximize solar savings.

What financing options does ACEN Solar provide?

They offer flexible financing options to make solar affordable with minimal upfront costs.

Get a Free Solar Quote

Interested in ACEN Solar? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.