
Ace Solar Ltd is a UK-based renewable energy company dedicated to providing high-quality solar PV systems, battery storage, and EV charging solutions for homes and businesses. Known for professionalism, reliability, and strong customer service, the company delivers bespoke renewable energy solutions designed to lower energy costs, reduce carbon footprints, and provide long-term energy independence.
The mission of Ace Solar Ltd is to make solar energy affordable and accessible, offering tailored systems that combine cutting-edge technology with expert engineering. Their vision is to play a key role in advancing the UK’s clean energy transition by empowering communities to adopt renewable technologies that support the country’s net zero goals.
With a skilled team of engineers and installers, Ace Solar Ltd offers end-to-end services, from consultation and design through to installation and aftercare. The company’s transparent approach and dedication to customer satisfaction ensure that every project meets the highest standards of safety, efficiency, and sustainability.
Ace Solar Ltd partners with leading global renewable manufacturers to ensure system performance and reliability:



Ace Solar Ltd operates with or in line with the following certifications:
Ace Solar Ltd provides warranties aligned with UK solar industry practices:
English
Several years of professional experience in the renewable energy sector
Dozens of residential and commercial installations delivered across the UK
I have had my solar panels and batteries installed from Ace Solar. Karl is very professional and took time to explain the need vs want of the system required at my place. We had different scenarios quoted for. Once we decided, Karl applied for necessary permission required, had the dates set and promptly finished the job. Within no time, we got the export MPAN which helped to get the SEG tariff set up quickly.
A couple of roof tiles broke. I don't know if this was done during installation but it's a bit of a coincidence if not. Anyway, these things can happen, it's nobodies fault, and it's how the installers sort out the problem that's important. Karl arranged a time to come and look. He then came back a few days later and replaced the tiles free of charge so that the roof is as good as new. Great service - Thanks. Well worth five stars.
Ace Solar Ltd completed a challenging installation of 78 panels on the roof of St Wulfram's church in Grantham. This is a Grade I listed 5-star rated church and the process of getting all necessary consents (planning and ecclesiastical) has taken over two years. Ace Solar (led by Karl Kelk) persevered with us and the installation itself went smoothly and we are now generating most of our electrical needs (9am to 4pm every sunny day). This is tremendous news for the environment and will positively impact on our budgets.
Ace Solar Ltd was incorporated on 29 March 2010.
Yes — their site indicates they provide “no obligation” free quotes via enquiry or form.
They promise after-sales support and guarantee workmanship; for exact warranty durations (on panels, labor), ask when getting a quote.