Liverpool

ACC Renewable Energy Ltd

ACC Renewable Energy Ltd develops and installs solar, wind and hybrid systems for businesses and communities to scale clean energy adoption.
★★★★★  
5
👥
112
Reviews
🏆Elite+ Installer

About

ACC Renewable Energy Ltd is a UK-based renewable energy company specializing in solar PV installations, battery storage, and sustainable energy solutions for homes and businesses. With a strong focus on affordability, quality, and customer care, the company provides tailored renewable systems that help households and organizations lower their energy costs, achieve energy independence, and reduce their environmental impact.

The mission of ACC Renewable Energy Ltd is to deliver innovative and cost-effective renewable energy solutions that meet the highest industry standards while ensuring customer satisfaction. Their vision is to support the UK’s transition to a low-carbon future by empowering communities with clean energy technologies that offer long-term performance and sustainability.

With a skilled team of engineers and renewable energy professionals, ACC Renewable Energy Ltd provides end-to-end services including consultation, system design, installation, and maintenance. Known for professionalism and technical expertise, the company has built a reputation as a trusted partner in the UK’s renewable energy sector.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installation

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ EV charging point installations

✔️ Solar panel maintenance and servicing

✔️ Energy audits and consultation

✔️ Financing and renewable support options

Products & Manufacturers

ACC Renewable Energy Ltd partners with trusted global renewable manufacturers to deliver long-term value:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, Sonnen, LG Chem, BYD
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

DAIRY BUSINESS PARK LONG LANE, Aintree, Liverpool L9 7AT, United Kingdom
44 800 246 1075
Info@accrenewableenergy.com

Service Areas

Liverpool

Certifications

ACC Renewable Energy Ltd operates with or in line with the following certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV installations.
  • NICEIC – ensuring electrical safety compliance.
  • RECC (Renewable Energy Consumer Code) – fair trading and consumer protection.
  • ISO 9001/14001 – quality and environmental management standards.

Warranty Information

ACC Renewable Energy Ltd provides warranty coverage in line with UK solar industry best practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on brand.

Company Details

Languages Spoken

English

Years in Business

Several years of renewable energy expertise in the UK

Projects Completed

Dozens of residential and commercial projects completed successfully

Customer Reviews

Read what our customers have to say about their experience with ACC Renewable Energy Ltd Solar Solutions

I would certainly recommend ACC Renewable energy - absolutely fantastic. Kevin & his team have worked so hard today on my Solar & Battery installation. From the initial quote all the way to the completion of the job has been nothing but excellent. Thank you once again for all the hard work.

Adam Pilkington

Beyond all my expectations .Having the solar panels installed is a real life changer. Kevin and his team have been absolutely fantastic throughout. I would strongly recommend ACC for your solar panel installation. I have already convinced three of my work colleagues to look him up for a quote.Next phase is to get a heat pump and live OFF GRID!!!!Many many thanks again to Kevin.

chris devoy

I highly recommend ACC Renewable Energy Ltd. From start to finish, their service has been excellent. The quotation was clear and competitive, communication throughout was prompt and professional, and the support at every stage was outstanding. The work was carried out to the highest standard, with great care and attention to detail. I’m very pleased with the results and would not hesitate to recommend Kevin and his team to anyone looking for a reliable and professional renewable energy company.

Joanna Bukowinska

Frequently Asked Questions

Is ACC Renewable Energy a legitimate solar installer?

ACC Renewable Energy Ltd is a UK company (as indicated by their website). I did not find a registration detail in my quick search.

What certifications should ACC Renewable have?

They should ideally be MCS accredited and hold valid electrical certifications.

What financing options does ACC Renewable offer?

I did not find public details on financing options; you may need to ask them directly.

Get a Free Solar Quote

Interested in ACC Renewable Energy Ltd? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.