Absolute Solar is a UK-based renewable energy company specializing in the design, installation, and maintenance of solar PV systems, battery storage solutions, and EV charging infrastructure. With a strong reputation for professionalism and quality workmanship, the company helps homeowners and businesses transition to clean, reliable, and cost-effective energy.
The mission of Absolute Solar is to provide sustainable energy solutions that lower energy costs, reduce reliance on fossil fuels, and support the UK’s net zero goals. Their vision is to lead by example in the renewable sector by offering innovative, customer-focused solutions that combine cutting-edge technology with long-term value.
With years of experience and a dedicated team of engineers, Absolute Solar delivers end-to-end services including consultation, system design, installation, and aftercare. Known for transparency, reliability, and high-quality service, the company has become a trusted choice for clients seeking sustainable energy solutions.
Absolute Solar works with globally recognized renewable energy manufacturers to ensure system efficiency and reliability:



Absolute Solar operates with or in line with the following certifications:
Absolute Solar provides warranties consistent with UK solar industry standards:
English
Several years of expertise in the UK renewable energy sector
Dozens of residential and commercial solar projects successfully completed
Fantastic service from start to finish. Looked at a number of firms but Absolute were our choice. Quality branded equipment, SOLIS, Q-Cell, Pylontech etc. Great support and really quick install. With the increasing energy bills you should certainly consider renewables.
I have recently had Solar Panels and Storage Battery installed by Absolute Solar Ltd and I take great pleasure to say that it was a totally painless, pleasant and professional experience.The scaffolding was erected on the agreed date.
We had solar panels fitted on two flats in Bedworth 2 years ago. Still waiting for paperwork from them to register with electric company to get benefit of them very poor service
Absolute Solar has been operating for over 15 years in the solar and renewable energy sector.
Yes — Absolute Solar is MCS accredited, NAPIT approved, and also holds CHAS accreditation.
Yes — beyond solar PV they provide battery storage systems and EV charging solutions.