Nottingham

21 Degrees Nottingham

21 Degrees Nottingham offers solar, insulation, heat pump & retrofit services to homes and businesses in Nottinghamshire with local expertise & trust.
★★★★★  
5
👥
6
Reviews
🏆Elite+ Installer

About

21 Degrees Nottingham is a regional branch of 21 Degrees, a UK-based renewable energy and sustainable heating specialist. Focused on delivering solar PV, battery storage, heat pumps, and EV charging solutions, the Nottingham team provides tailored systems for homeowners and businesses seeking to lower energy costs, achieve energy independence, and reduce carbon emissions.

With a mission to make renewable energy and sustainable heating practical, affordable, and accessible, 21 Degrees Nottingham offers high-quality installations backed by expert engineering and excellent customer care. Their vision is to help accelerate the UK’s clean energy transition by empowering local communities to adopt greener technologies that align with national net zero targets.

The Nottingham branch delivers end-to-end services, including consultation, bespoke system design, installation, and aftercare. Known for professionalism, transparency, and a customer-first approach, 21 Degrees Nottingham has built a strong reputation for delivering efficient, reliable, and future-ready renewable energy systems across the region.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar PV installations

✔️ Commercial solar PV systems

✔️ Battery storage integration

✔️ Heat pump installation and servicing

✔️ EV charging station installations

✔️ Solar panel maintenance and repairs

✔️ Energy audits and consultation

✔️ Financing and renewable support

Products & Manufacturers

21 Degrees Nottingham partners with globally trusted renewable energy manufacturers to ensure system reliability and performance:

  • Solar Panels: Trina Solar, JA Solar, Q CELLS, SunPower, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • Heat Pumps: Mitsubishi Electric, Vaillant, Daikin, NIBE
  • EV Charging: Pod Point, Zappi, Rolec

Project Gallery

Contact Information

Unit 5a, Rani Drive, Nottingham NG5 1RF, United Kingdom
44 115 822 2290
info@21degrees.com

Service Areas

Nottingham

Certifications

21 Degrees Nottingham operates with or in line with recognized UK certifications:

  • MCS (Microgeneration Certification Scheme) – certified solar PV and heat pump installations.
  • NICEIC – compliance with UK electrical safety standards.
  • RECC (Renewable Energy Consumer Code) – ensuring fair consumer practices.
  • Gas Safe Register – certified heating engineers.
  • ISO 9001/14001 – quality and environmental management systems.

Warranty Information

21 Degrees Nottingham provides warranties consistent with UK renewable energy best practices:

  • Solar panels – 20–25 years performance guarantee.
  • Inverters – 5–12 years manufacturer’s warranty.
  • Heat pumps and boilers – 5–10 years depending on manufacturer.
  • Workmanship/installation – 5–10 years.
  • Battery storage systems – 5–10 years depending on product.

Company Details

Languages Spoken

English

Years in Business

Several years of experience in renewable energy and sustainable heating

Projects Completed

Dozens of residential and commercial projects successfully delivered across Nottingham and the surrounding areas

Customer Reviews

Read what our customers have to say about their experience with 21 Degrees Nottingham Solar Solutions

I recently had solar panels installed in Nottingham, and I couldn't be happier with the results! The team provided excellent customer service throughout the process. Additionally, incorporating an air source heat pump has significantly increased the efficiency of my home's heating system. Embracing renewables has been a game-changer for me. Highly recommend their services!

Neil Wells

From the very beginning, the whole team have been very helpful and knowledgeable. When we chose to have solar panels these appeared to be the only supplier to go with in and around Nottingham.The advice we were given regarding our air source heat pump was incredible as we were a little confused at first.

ryan benton

Nottingham based firm. Customer service is excellent. Really pleased with my solar panel and air source heat pump installation. Saving me money and contributing to the support of renewable.

Jason Staples

Frequently Asked Questions

How long has 21 Degrees been in business?

21 Degrees is well established in the UK and works in energy efficiency, renewables and low-energy homes. (They present as a full service company in the renewables sector.)

Does 21 Degrees offer free quotes or consultations?

Yes — they provide no-obligation quotes and design services as part of their customer onboarding.

What financing options does 21 Degrees provide?

Their website describes incentives and cost reductions (e.g. 0% VAT on solar installations) and they likely offer financing or payment plans — check directly with them.

Get a Free Solar Quote

Interested in 21 Degrees Nottingham? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.