London

Solar Panel Installers Wimbledon

Solar Panel Installers Wimbledon, MCS certified, installs solar panels, battery storage, and EV charging units with expert engineering support across Surrey and Wimbledon.
★★★★★  
5
👥
1338.0
Reviews
🏆Elite+ Installer

About Sunergy

Chiltern Solar Ltd is a specialist solar energy installer based in the UK, dedicated to providing high-quality renewable energy solutions for homes and businesses. With a strong reputation built on reliability, expertise, and customer care, the company has become a trusted partner for clients seeking to reduce energy bills and environmental impact.

Chiltern Solar Ltd focuses on delivering bespoke solar PV systems designed to maximize efficiency and performance. The company’s mission is to make sustainable energy accessible and cost-effective, enabling customers to embrace a cleaner, greener future. With years of industry experience, their skilled team of engineers and installers ensures every project is completed to the highest standards of safety, compliance, and efficiency.

Highly rated by customers across the region, Chiltern Solar Ltd is known for its transparency, quality products, and long-term aftercare. Whether working on residential installations, commercial projects, or battery storage solutions, the company brings innovation and professionalism to every job, making it a reliable choice in the UK’s solar industry.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar panel installation

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging installations

✔️ Solar system maintenance and repairs

✔️ Energy performance audits

✔️ Financing and consultation services

Products & Manufacturers

Chiltern Solar Ltd partners with reliable solar and renewable technology brands, including:

  • Solar Panels: Q CELLS, SunPower, Trina Solar, JA Solar, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Rolec, Zappi, Pod Point

Project Gallery

Contact Information

Moons Moat North Industrial Estate, Unit 21 Walkers Rd, Redditch B98 9HE, United Kingdom
441527757980
customerservice@fogstar.co.uk

Service Areas

London

Certifications

Chiltern Solar Ltd holds or aligns with recognized UK industry certifications, including:

  • MCS (Microgeneration Certification Scheme) – quality and performance standards.
  • NICEIC – certified electrical compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection.

ISO 9001/14001 – quality and environmental management (where applicable).

Warranty Information

Chiltern Solar Ltd provides warranties consistent with best industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.

Workmanship/installation – 5–10 years coverage.

Company Details

Languages Spoken

English

Years in Business

Customer Reviews

Read what our customers have to say about their experience with Sunergy Solar Solutions

I recently ordered the Fogstar 18650 4000mah 10A for the first time, and I have to say, I was pleasantly surprised to find that the battery came with individual cartridges. It's amazing to see the air pump working again! I really appreciate how well everything worked out, and I definitely plan on ordering a few more in the future. Thank you for such a great experience!

Michael Chum

Mixed views, some good some not so good. Initially impressed with prompt delivery and tech support regarding charging of cells. I note that the website now mentions constant voltage psu. When building system my case did not match the "new" you tube "instruction" video. Be aware that the fuse stud posts are either vertically or horizontally placed. As I had been supplied the horizontal style I was unable to complete my build due to incorrect or lacking parts or i should have been supplied the vertical style which would have worked with parts supplied! The new instructional YouTube shows vertical placement . Presently awaiting update from email conversation as to resolution.

Anon Mouse

A truly professional company with reliable products and services. Just got a home solar battery from them for a superb price and it was a DIY pack and I was able to assemble it without a single issue just by watching their tutorial video on YouTube. Also I was able to connect it to my Sunsynk inverter just by using a standard pre made lan cable. All works perfectly. The balance of the cells is ridiculously good, within 10-15mV across 16 cells.

patrik bartos

Frequently Asked Questions

What areas does Solar Panel Installers Wimbledon serve?

They provide professional solar panel installation services in Wimbledon and nearby areas of South West London.

Does Solar Panel Installers Wimbledon offer free quotes or consultations?

Yes, they offer free consultations and quotations to help customers choose the right solar system.

What warranties does Solar Panel Installers Wimbledon provide on panels and installation?

They offer manufacturer-backed warranties and installation guarantees for long-term performance.

Get a Free Solar Quote

Interested in Sunergy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.