I was extremely pleased with the service provided by Jake and David. Both were very friendly, attentive, and went above and beyond to ensure that my needs were met. The carried out work as agreed and at all stage they were both confirming I was happy with the way work was completed. I would highly recommend Imperial Solar Solutions to anyone looking for exceptional service.
I had an amazing experience with Imperial Solutions! From the very first consultation, David and his team were incredibly professional, knowledgeable, and transparent about the entire solar installation process. They took the time to answer all my questions, provided a clear breakdown of costs and savings, and ensured I was comfortable with every step. The installation itself was seamless—efficient, on time, and with no hidden surprises. The crew was courteous and left everything clean and tidy. My system has been running flawlessly, and I’m already seeing significant savings on my electricity bill!
I couldn’t be happier with my solar panels. Everything was explained clearly before I made my decision. Excellent and trustworthy business. Took care of all my needs and explained step by step. It took care of exactly what I was looking for. The staff were really friendly, they went above and beyond to make sure I was happy. Definitely recommend this excellent team.
Imperial Solar Solutions provides solar panel installations across the UK for both residential and commercial clients.
Yes, they offer integrated renewable solutions including solar batteries and EV charging stations.
They provide long-term manufacturer warranties on solar equipment along with workmanship guarantees.