London

Go Greener Energy Limited

Go Greener Energy Limited provides solar panel installations and battery storage solutions for homes and businesses, helping clients maximize energy savings and reduce carbon footprints.
★★★★★  
4
👥
45.0
Reviews
🏆Elite+ Installer

About Sunergy

Chiltern Solar Ltd is a specialist solar energy installer based in the UK, dedicated to providing high-quality renewable energy solutions for homes and businesses. With a strong reputation built on reliability, expertise, and customer care, the company has become a trusted partner for clients seeking to reduce energy bills and environmental impact.

Chiltern Solar Ltd focuses on delivering bespoke solar PV systems designed to maximize efficiency and performance. The company’s mission is to make sustainable energy accessible and cost-effective, enabling customers to embrace a cleaner, greener future. With years of industry experience, their skilled team of engineers and installers ensures every project is completed to the highest standards of safety, compliance, and efficiency.

Highly rated by customers across the region, Chiltern Solar Ltd is known for its transparency, quality products, and long-term aftercare. Whether working on residential installations, commercial projects, or battery storage solutions, the company brings innovation and professionalism to every job, making it a reliable choice in the UK’s solar industry.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar panel installation

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging installations

✔️ Solar system maintenance and repairs

✔️ Energy performance audits

✔️ Financing and consultation services

Products & Manufacturers

Chiltern Solar Ltd partners with reliable solar and renewable technology brands, including:

  • Solar Panels: Q CELLS, SunPower, Trina Solar, JA Solar, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD
  • EV Charging: Rolec, Zappi, Pod Point

Project Gallery

Contact Information

Office 1, RYKNILD HOUSE, Burnett Rd, Streetly, Sutton Coldfield B74 3EL, United Kingdom
441214934095
info@go-greener.uk

Service Areas

London

Certifications

Chiltern Solar Ltd holds or aligns with recognized UK industry certifications, including:

  • MCS (Microgeneration Certification Scheme) – quality and performance standards.
  • NICEIC – certified electrical compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection.

ISO 9001/14001 – quality and environmental management (where applicable).

Warranty Information

Chiltern Solar Ltd provides warranties consistent with best industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.

Workmanship/installation – 5–10 years coverage.

Company Details

Languages Spoken

English

Years in Business

Customer Reviews

Read what our customers have to say about their experience with Sunergy Solar Solutions

Having done my research and getting several quotes for my solar system ( which I found a nightmare to navigate with various systems and products available far too many to make a simple decision) I can’t recommend Go Greener Energy highly enough. Excellent service from day one, Craig was informative and knowledgeable with no pressure to purchase, The fitting team were first class and very professional. The work was exceptional leaving no mess. Explanation of the system and how it works was very clear and easy to understand.

Adrian Hill

From the moment Alastair visited my house to explain the procedure and provide advice concerning the number of recommended solar panels and battery, I received excellent care and attention from both him and the back room staff at Go Greener Energy Ltd. The installation was extremely efficient and was completed within one day on the date specified.

Len Tompsett

An excellent service beginning with a very comprehensive sales meeting with Alastair Marchbank, prompt delivery of the equipment, and a first class installation team who were very friendly doing a clean and tidy job. I would recommend this company to anyone considering a solar energy installation. High class job at a very competitive price.

David Evans

Frequently Asked Questions

Is Go Greener Energy Limited a legitimate solar installer?

Yes, Go Greener Energy is an accredited UK-based company specializing in solar panels and renewable energy systems.

Does Go Greener Energy Limited offer free quotes or consultations?

Yes, they provide free consultations and property surveys to recommend the best solar solutions.

How eco-friendly are Go Greener Energy Limited’s solar solutions?

Their installations are designed to cut carbon emissions and promote sustainable living.

Get a Free Solar Quote

Interested in Sunergy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.