London

Arin Power Limited

Arin Power Limited designs and installs custom solar power systems for homes and businesses, offering energy-efficient, eco-friendly renewable energy solutions.
★★★★★  
5
👥
14.0
Reviews
🏆Elite+ Installer

About Sunergy

Chiltern Solar Ltd is a specialist solar energy installer based in the UK, dedicated to providing high-quality renewable energy solutions for homes and businesses. With a strong reputation built on reliability, expertise, and customer care, the company has become a trusted partner for clients seeking to reduce energy bills and environmental impact.

Chiltern Solar Ltd focuses on delivering bespoke solar PV systems designed to maximize efficiency and performance. The company’s mission is to make sustainable energy accessible and cost-effective, enabling customers to embrace a cleaner, greener future. With years of industry experience, their skilled team of engineers and installers ensures every project is completed to the highest standards of safety, compliance, and efficiency.

Highly rated by customers across the region, Chiltern Solar Ltd is known for its transparency, quality products, and long-term aftercare. Whether working on residential installations, commercial projects, or battery storage solutions, the company brings innovation and professionalism to every job, making it a reliable choice in the UK’s solar industry.

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

✔️ Residential solar panel installation

✔️ Commercial solar PV systems

✔️ Battery storage solutions

✔️ EV charging installations

✔️ Solar system maintenance and repairs

✔️ Energy performance audits

✔️ Financing and consultation services

Products & Manufacturers

Chiltern Solar Ltd partners with reliable solar and renewable technology brands, including:

  • Solar Panels: Q CELLS, SunPower, Trina Solar, JA Solar, LG Solar
  • Inverters: SolarEdge, SMA, Fronius, Huawei
  • Battery Storage: Tesla Powerwall, LG Chem, Sonnen, BYD

EV Charging: Rolec, Zappi, Pod Point

Project Gallery

Contact Information

Companies House Crown Way Cardiff CF14 3UZ United Kingdom
442036408691

Service Areas

London

Certifications

Chiltern Solar Ltd holds or aligns with recognized UK industry certifications, including:

  • MCS (Microgeneration Certification Scheme) – quality and performance standards.
  • NICEIC – certified electrical compliance.
  • RECC (Renewable Energy Consumer Code) – consumer protection.

ISO 9001/14001 – quality and environmental management (where applicable).

Warranty Information

Chiltern Solar Ltd provides warranties consistent with best industry practices:

  • Solar panels – 20–25 years performance warranty.
  • Inverters – 5–12 years manufacturer’s warranty.

Workmanship/installation – 5–10 years coverage.

Company Details

Languages Spoken

English

Years in Business

Customer Reviews

Read what our customers have to say about their experience with Sunergy Solar Solutions

**Outstanding Solar Panel Installation Experience: Highly Professional and Timely!** I recently had the pleasure of working with Arin to install solar panels on my home, and I am absolutely thrilled with the exceptional service they provided. From start to finish, the entire process was handled with utmost professionalism and efficiency.

Vitor Gomes

A huge thank you to Stephen and Arin Power team for being one of our most valued customers! It's been a true pleasure working alongside them. Team not only offer unwavering support but also possess a deep understanding of their purchases. Their well-planned orders streamline our operations, enabling us to consistently provide top-notch service.

Adi Shukla

Anuj and his team have carried out numerous Solar Installation projects for many of my Business clients. I'm pleased to say that all of the work that has been carried out, has been done to a Grade A standard and all of my clients have been extremely happy with their Solar PV installations and the aftercare customer service provided by Arin Power.

Ben Fearon

Frequently Asked Questions

Is Arin Power Limited a legitimate solar installer?

Yes, Arin Power is a trusted UK-based solar and renewable energy company serving both domestic and commercial clients.

What financing options does Arin Power Limited provide?

They offer tailored financing and flexible payment options to make solar panels more accessible.

What warranties does Arin Power Limited provide on panels and installation?

Customers receive manufacturer-backed warranties and professional installation guarantees.

Get a Free Solar Quote

Interested in Sunergy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.