London

ACEN Solar

ACEN Solar is a global renewable energy company investing in large-scale solar power projects, advancing clean power and sustainable energy growth across Asia Pacific.
★★★★★  
5
👥
41.0
Reviews
🏆Elite+ Installer

About Sunergy

Company Rating Breakdown

5.0
★★★★★
Based on 48 verified reviews
Product Quality
20% of total rating
★★★★★
5.0
Installation & Service
20% of total rating
★★★★★
5.0
Customer Reviews
15% of total rating
★★★★★
5.0
Pricing & Financing
15% of total rating
★★★★★
4.9
Warranties
10% of total rating
★★★★★
5.0
Certifications
10% of total rating
★★★★★
5.0
Company Experience
10% of total rating
★★★★★
5.0

Services Offered

Products & Manufacturers

Project Gallery

Contact Information

44 Broadway, London E15 1XH, United Kingdom
442030053282

Service Areas

London

Certifications

Warranty Information

Company Details

Customer Reviews

Read what our customers have to say about their experience with Sunergy Solar Solutions

High satisfactory installation work. Attention to detail, dedication, knowledge, responsiveness, everything that a customer looks for exceeded my expectations. A standard rarely seen in other similar companies. Strongly recommend ACEN Solar.

Lequn Su

Acen Solar did a fantastic job on my Solar install. I had got quite a few different quotes and was finding a lot of companies were overpriced and inflexible. Aras was the complete opposite and I found him down to earth, helpful and willing to work with me to provide the equipment and install I was looking for. The quote was also itemised in terms of equipment / labour/ scaffolding which incredibly no other company seems to provide. Aras came round to do a survey within a few days and had the job done about 2 weeks later. I ended up fitting 14 panels which far exceeded my expectations in terms of generation and I’m over the moon about it. All documentation and MCS certificate was provided a few weeks after which was longer than I expected but understand there is a wait for DNO.

Laurie Robinson

Having undertaken a fair bit of research and looking for a local installer I came across Acen Solar. Aras spent much time with me going through a few iterations with my constant questions he was very patient and was always very helpful to draw up proposals, eventually settling on a optimum configuration. He and his team did the install within a week. System is now up and running and exports also setup and I'm definitely seeing a return on my investment.

Naveed Bashir

Frequently Asked Questions

What areas does ACEN Solar serve?

ACEN Solar provides solar panel installation services across London and nearby regions, focusing on residential and commercial properties.

Does ACEN Solar help with government incentives or grants?

Yes, they guide customers through available government schemes and incentives to maximize solar savings.

What financing options does ACEN Solar provide?

They offer flexible financing options to make solar affordable with minimal upfront costs.

Get a Free Solar Quote

Interested in Sunergy? Fill out this form and they'll contact you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.