Software Review10 min read

SMA Sunny Design Review: Free Tool, PRO Plan and Limits

Sunny Design suits installers and planners who work with SMA inverters and want a free browser tool for roof planning, shading and yield. SMA's manual describes planning with SMA inverters and does not say whether you can add other brands.

SurgePV publishes this review and sells solar design and proposal software, so we compete with SMA Sunny Design. Everything we state about SMA Sunny Design comes from its own website, checked October 2026; where it does not publish something we say so. We have not run side-by-side tests. How we evaluate software

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published Updated Checked October 2026

Pros

Free of charge to use, with a free sign-up using an SMA ID
Runs in a web browser, on an iPad or on an Android tablet
Roof planning with shading analysis is listed at every access level
Off-grid and PV hybrid design is listed for the free registered account
PRO adds energy systems with batteries, heat pumps, combined heat and power and charging stations
Teams can share projects (team workspaces came in version 6.00)

Cons

Saving projects needs a registered account; the anonymous level does not save
PRO costs 600 € per year (net)
The manual describes planning with SMA inverters and does not say whether other brands can be added
Needs an internet connection and a current browser
P50 and P90 yield values, sun-tracking mounts and carports are not mentioned in the manual or on the product page

Quick answer

SMA Sunny Design is a PV planning tool from inverter maker SMA. It is free in a web browser or on a tablet, and covers roof planning with shading analysis, string design and off-grid or hybrid systems. Sunny Design PRO costs 600 € per year (net) and adds batteries, heat pumps and more. SMA's manual describes planning with SMA inverters. Per SMA, checked October 2026.

Planning with more than SMA inverters?

Sunny Design is built around SMA products. Book a guided demo to see SurgePV design, shading, yield and proposals in one workflow.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. SurgePV competes with Sunny Design and is compared in the table below. The facts here come from SMA’s product page and manual and from SurgePV’s pricing, checked October 2026. Last checked: October 2026.

What does SMA Sunny Design do?

Sunny Design is SMA’s free planning tool for PV systems, with a paid PRO level for whole energy systems. SMA says you can plan a grid-connected PV system with or without a battery, an off-grid island system, or a hybrid system. Sunny Design then “takes all technical specifications for the various components into account” (SMA product page). Here is what SMA lists, by access level.

SMA Sunny Design public website page, captured 29 October 2026
SMA Sunny Design public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.
Feature Anonymous Registered (free) PRO
Design of on-grid PV systems Yes Yes Yes
Visual roof planning including shading analysis Yes Yes Yes
Design of off-grid and PV hybrid systems No Yes Yes
Saving and managing projects No Yes Yes
Own PV modules, locations and load profiles No Yes Yes
Planning of energy systems with integrated energy management No No Yes
Import and export of 3D models No No Yes
Tariff management No No Yes
Consumption data and load profile analysis No No Yes
Extended project documentation No No Yes
Export of time series No No Yes

Source: the “Overview of Sunny Design functions” table on the SMA product page, read 28 October 2026. “Yes” means SMA marks the feature for that level. “No” means SMA leaves the cell empty.

More facts from the same page and the release notes on it:

  • Roof planning. Release 5.20 added shading analysis. It shows the yearly shading of roofs, the percent of shading on each module, and the shadow path at a chosen time. Release 5.90 added Google Solar API data to 3D roof planning.
  • String design. Release 5.30 added electrical design with string planning. Release 5.70 added a downloadable schematic circuit diagram, a simple drawing of the system from the modules to the grid connection.
  • Large systems. Release 5.60 added a project type for large systems, including DC combiner design.
  • Teams. Release 6.00 added team workspaces with roles and permissions. Release 6.10 lets you give a team access to chosen projects only.
  • Results. The product page lists a self-consumption forecast and an energy and financial assessment of the system. The manual’s glossary defines net present value and annual return, which it calls an internal rate of return.
  • Quotes and documents. The manual says an automatic quotation holds the customer’s address, a quotation number, a project cost overview, standard texts and a field for your signature (Create quotation).

What PRO adds, in SMA’s words: PRO “takes battery-storage systems and thermal components, such as combined heat and power plants and heat pumps, into account.” SMA also lists electric vehicles and charging stations, peak load shaving with a battery, and project templates for commercial energy systems and private homes. A new item on the product page is an integrated Renusol planning tool.

How you start: the manual says you need an SMA ID. You go to SunnyDesignWeb.com and sign up free of charge (Signing up). You need a computer with internet access and a supported browser (System requirements).

How much does SMA Sunny Design cost?

Sunny Design is free of charge, and Sunny Design PRO costs 600 € per year (net, meaning before tax), per SMA’s product page.

Plan Price in SMA’s words Notes from SMA
Sunny Design, anonymous “free of charge” No saving of projects
Sunny Design, registered “free of charge” SMA ID needed; saves projects; off-grid and hybrid design
Sunny Design PRO “Price per year (net)”: 600 € “month-long free trial”; the manual says 30 days

Source: SMA product page and the manual page Testing Sunny Design Pro. Checked October 2026. “Net” means the price before tax.

Sunny Design price by plan, net of tax (euros per year, net)
  • Sunny Design, anonymous0 €
  • Sunny Design, registered0 €
  • Sunny Design PRO600 € (30-day trial)

Source: SMA Sunny Design product page, checked October 2026.

Need proposals across inverter brands?

SurgePV lists proposal generation and bill-of-materials output in its scope. Bring a live project to a guided demo.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Who should choose SMA Sunny Design?

It suits you if:

  • You plan systems with SMA inverters. The manual says you can plan “with all available SMA inverters” (Project overview).
  • You want roof planning, shading and a yield and self-consumption forecast at no cost.
  • You design off-grid or hybrid systems. This needs the free registered account.
  • You plan whole energy systems with a battery, a heat pump or charging stations. This needs PRO.

Check first, or look elsewhere, if:

  • You plan with other inverter brands. SMA’s pages talk about SMA inverters and SMA product families. They do not say whether inverters from other makers can be added. We searched the product page and all 226 pages of the manual, read October 2026. Ask SMA before you rely on it.
  • You need P50 or P90 yield values (P90 is a yield expected to be met or exceeded in 90% of years; P50: 50%). We found no mention of them in the manual or on the product page.
  • You plan sun-tracking mounts (trackers that follow the sun) or carports. We found no mention of them in the manual or on the product page.
  • You need to work offline. The manual says a computer with internet access must be available.

SMA Sunny Design vs SurgePV: price, scope and limits

SurgePV competes with Sunny Design. These rows use SMA’s pages and SurgePV’s own pricing page.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.
Topic SMA Sunny Design SurgePV
Price Free of charge; PRO 600 € per year (net) USD per user per year: $1,899 (1 user), $1,499 per user (3 seats), $1,299 per user (5 seats)
Try it Free sign-up; PRO has a month-long free trial Guided demo; no self-serve trial
What it covers PV, off-grid, hybrid and energy-system planning, with SMA components 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output, proposal generation
Quotes An automatic quotation with standard texts (SMA manual) Proposal generation
Limits SMA inverters in the manual; brand list not stated Results depend on source data. Outputs support design and documents but do not replace approval by the engineer, authority, lender, insurer or utility.

The two prices use different currencies and units, so compare them on your own seat count. Taxes and renewal terms for SurgePV are set in your quote.

Bottom line

Choose Sunny Design if you mainly plan with SMA inverters and want free roof planning and shading, or PRO for batteries and heat pumps. Choose SurgePV if you plan across brands and need proposals. Book a Free Demo or see the SurgePV pricing page.

Other options

Frequently asked questions

What is SMA Sunny Design?

Sunny Design is a planning tool for PV systems from SMA Solar Technology, an inverter maker. SMA says you can plan grid-connected systems with or without a battery, off-grid island systems and hybrid systems. You open it in a web browser or on an iPad or Android tablet.

Is Sunny Design free?

Yes, Sunny Design is free of charge to use, with a paid PRO plan on top. SMA says you can use it without paying. Saving projects, off-grid design and your own modules need a free registered account with an SMA ID. The paid Sunny Design PRO plan costs 600 € per year (net), according to SMA’s product page, read in October 2026.

What is Sunny Design Web, and how do I open it?

Sunny Design Web is the browser version at SunnyDesignWeb.com. SMA’s manual says to go to that address and choose to sign up free of charge. You need an SMA ID to sign up. The manual lists Edge, Firefox, Chrome, Opera and Safari as supported browsers.

What does Sunny Design PRO add?

SMA lists these PRO features: planning of energy systems with integrated energy management, import and export of 3D models, tariff management, consumption and load profile analysis, extended project documentation and export of time series. PRO costs 600 € per year (net). SMA also offers a month-long free trial.

Can I use Sunny Design with other inverter brands?

The SMA pages we read do not say. Its manual says you can plan with all available SMA inverters, and it lets you limit the inverter list by SMA product family. The manual and product page do not say whether inverters from other makers can be added. Ask SMA before you rely on it.

Does Sunny Design work on an iPad or offline?

SMA says you can open Sunny Design on an iPad or an Android tablet. The manual says a computer with internet access must be available, so it does not describe an offline mode. It lists Edge, Firefox, Chrome, Opera and Safari as supported browsers.

Is SMA Sunny Design better than SurgePV?

It depends on your inverter mix. Sunny Design is free and built around SMA inverters, while SurgePV is paid per user and lists proposal generation and a broader design scope. SMA’s pages do not say whether other brands can be added. Sources: SMA product page and the SurgePV pricing page, checked October 2026.

Sources

All pages were read on 28 October 2026.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

See how SurgePV handles design and proposals

SurgePV is solar design and proposal software covering 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Book a guided demo to see it on your own project.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.