Software Review9 min read

Pylon Review: Pros and Cons

Pylon suits small teams that design home solar systems and want to pay per project, not per seat. Its Standard plan stops at 30kW, and its pricing page does not name the currency.

SurgePV publishes this review and sells solar design and proposal software, so we compete with Pylon. Everything we state about Pylon comes from its own website, checked October 2026; where it does not publish something we say so. We have not run side-by-side tests. How we evaluate software

Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published Updated Checked October 2026

Pros

Pay per project: Standard $4.00 and Pro $10.00 on the vendor's pricing page
Free credits for five Standard projects, and the vendor says no credit card is needed
Single line diagrams (SLDs) come from the design, with no extra fee per diagram, says the vendor
3D shading simulation is listed on all three plans
The vendor says its component list has over 20,000 panels, inverters and batteries
Lists links to Xero, ServiceM8, Mailchimp, Nearmap, Brighte, Smart Ease and Solaris Finance

Cons

Standard plan: largest system is 30kW DC; Pro and Enterprise list 99kW+
Up to five designs per project on every plan
Solar CRM is an add-on from $49.00 per user per month, billed monthly
eSignature costs 80c per project on every plan
Commercial bill input and peak-shaving analysis are marked Coming soon
The pricing page does not name the currency for the $4.00 and $10.00 prices

Quick answer

Pylon is a web tool for solar design and proposals that charges per project: Standard is $4.00 and Pro is $10.00, per its pricing page, checked October 2026. The deciding factor is size: Standard stops at 30kW DC, and Pro adds battery design and commercial projects. The page does not name the currency, and the CRM add-on costs extra.

Comparing Pylon with SurgePV?

Pylon charges per project, SurgePV per user per year. See which model fits your monthly project count.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category, so it competes with Pylon. The facts here come from the vendors’ public pages, checked October 2026. Last checked: October 2026.

Pylon is a web tool for designing solar systems and making proposals. It suits small teams that quote home systems and want to pay per project. The vendor charges $4.00 per project on Standard and $10.00 per project on Pro. Its pricing page does not name the currency. Standard stops at 30kW of panels (DC), and the CRM, a tool that tracks your leads, costs extra from $49.00 per user per month.

What Pylon does

This list comes from Pylon’s own pages, read in October 2026. Each row links to the page it came from.

Area What the vendor says Page
Design Place panels on high-resolution aerial imagery. The vendor notes this imagery is “available in select countries”. Solar design
Parts list “Over 20,000 solar panels, inverters, and batteries.” Solar design
Plans and photos “Design directly on builders plans or your own drone photography.” Solar design
3D shading “Predicts shading in seconds with high accuracy.” Listed on Standard, Pro and Enterprise. Pricing
Single line diagram (SLD) An SLD is a simple drawing of how the system is wired. The vendor says its SLDs “meet the requirements of major” network operators (DNSPs), and that there is “no additional fee” per diagram. SLD page
Batteries A battery design tool with a “battery advisor”. The vendor says it can simulate off-peak charging, time-of-use and days-of-autonomy cases. Battery design, Home page
Energy use data Interval data analysis, which uses a customer’s past energy use. Interval data
Proposals “Instant web & PDF proposals”. The home page says “proposals in under 2 mins”. Pricing, Home page
Signatures Digital signatures on proposals, at 80c per project. E-signatures, Pricing
Cable report Click-and-drag cable paths to make a voltage rise report. Solar design
Australian battery program A May 2025 update says Pylon added “provisional support” for the Cheaper Home Batteries Program. May 2025 update
Tablet use The vendor says its 2D design studio is “compatible with the iPad”. Shading blog post
Awards The vendor says it won Best Solar Innovation in the Finder Innovation Awards 2021, for its 3D shading feature. Award post
Links to other tools The home page names Mailchimp, SolarQuotes, Xero, ServiceM8, Nearmap, Brighte, Smart Ease and Solaris Finance. Home page
API The vendor says its API lets you “integrate your favorite tools and automate your workflows”. The pricing page lists “API support” under Enterprise. Solar design, Developers

The CRM add-on lists these items: Solar Project Link, Email Sync, Auto Lead Processor, SMS, Web Forms and AI Assistance. Source: pricing page.

Pylon public website page, captured 29 October 2026
Pylon public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Price and plans

Pylon charges per project. A project is one address, and it can have up to five designs. The table quotes the vendor’s pricing page, checked October 2026.

Plan or add-on Vendor wording What the card lists
Standard $4.00 per project Solar system design, high resolution imagery, financial projections, instant web and PDF proposals. Maximum DC size: 30kW.
Pro $10.00 per project “Includes all Standard features”, plus Custom Load Profile, Battery storage design and Commercial sized projects. Maximum DC size: 99kW+.
Enterprise “Get in touch for details.” Single Sign-on, API support, dedicated support. Maximum DC size: 99kW+.
Solar CRM add-on “Starting from $49.00 per user per month, billed monthly.” Email sync, SMS, web forms, auto lead processor, AI assistance.
eSignature 80c/project Listed on Standard, Pro and Enterprise.
Payment Gateway 2.50% per transaction The vendor says “Fees include GST”.

Free start: the vendor’s FAQ says new users get “free credits for FIVE Standard Projects”. Credits are bought in packs inside the web app.

The pricing page shows $4.00 and $10.00 and does not name the currency. Pylon’s New Zealand pricing page shows NZ$4.00 and NZ$10.00. Ask the vendor which currency applies to you.

Pylon price per project (currency not named on the pricing page)
  • Standard$4 up to 30kW DC
  • Pro$10 battery design, commercial

Source: Pylon pricing page, checked October 2026.

Who it suits and who should look elsewhere

Pylon suits you if:

  • You quote home solar systems and want to pay per project.
  • Your systems fit the plan size: 30kW DC on Standard, or “99kW+” on Pro.
  • You want design, proposals and SLDs in one web tool, as the vendor describes.
  • You work in Australia or New Zealand. The vendor’s pages mention the Cheaper Home Batteries Program and the standard AS/NZS 5033:2021 (pricing page).

Look elsewhere, or ask the vendor first, if:

  • You need a system larger than the Pro limit. The pricing page shows “99kW+”, so ask what the top size is.
  • You need commercial bill input or peak-shaving analysis. The pricing page marks both “Coming soon”.
  • You need more than five designs on one project. The pricing page sets five.
  • You want a CRM at no extra cost. Pylon sells it as an add-on.
  • You need carport design, tracker design, east-west racking or P50, P75 and P90 results. We found no mention of these on any page in the getpylon.com sitemap, read in October 2026. That does not prove Pylon lacks them. Ask the vendor.

Compared with SurgePV

SurgePV publishes this page and competes with Pylon. These rows use Pylon’s pages and SurgePV’s public product facts and pricing page.

Topic Pylon SurgePV
How you pay $4.00 or $10.00 per project (currency not named) USD per user per year: Individual $1,899 per user per year (1 user); 3 seats $1,499 per user per year; 5 seats $1,299 per user per year
Trying it first Free credits for five Standard projects Guided demo. No self-serve trial.
What it covers Design, proposals, SLDs, 3D shading, battery design, CRM add-on 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output, proposal generation
Limits to know 30kW DC on Standard; five designs per project Results depend on source data and assumptions. Outputs support design work but do not replace approval by the responsible engineer, authority, lender, insurer or utility.

The two prices use different units, so do not add or compare them without your own project count.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Prefer one annual price per user?

SurgePV lists per-user annual pricing and covers design, shading, yield and proposals. Book a guided demo on your own project.

Book a Free Demo

Bottom line

Pylon suits small teams that design home systems and want to pay per project. Check the currency with the vendor first. To compare directly, read the Pylon and SurgePV comparison, see SurgePV pricing, or book a demo.

Other options

Sources

All pages were read in October 2026.

Frequently Asked Questions

What is Pylon?

Pylon is a web tool for solar design and proposals. Its pages carry a copyright line for Saru Technologies Pty. Ltd. The vendor also sells a CRM add-on, single line diagrams and a battery design tool. SurgePV competes with Pylon.

How much does Pylon cost?

The vendor’s pricing page lists Standard at $4.00 per project and Pro at $10.00 per project. Enterprise is get in touch. The page does not name the currency. Its New Zealand page shows NZ$4.00 and NZ$10.00. Checked October 2026.

Does Pylon have a free trial?

The vendor says new users get free credits for five Standard projects. Its pages say no contract and no credit card are required. After that you buy credits in packs inside the web app.

Does Pylon have a CRM?

Yes, as an add-on. The vendor lists Solar CRM from $49.00 per user per month, billed monthly. It lists email sync, SMS, web forms, an auto lead processor and AI assistance.

What are the alternatives to Pylon?

It depends on your work. See our Australia and residential software lists and our Pylon and SurgePV comparison. SurgePV is a competitor, so check each vendor’s own pages before you decide.

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

See how SurgePV handles design and proposals

SurgePV is solar design and proposal software covering 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Book a guided demo to see it on your own project.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.