Address-to-Roof-Model Workflow: 10 Steps

Build an address-to-roof-model workflow that checks the right building, source dates, geometry, and handoff status before solar design begins.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

An address-to-roof-model workflow should verify the intended building before generating roof geometry. Preserve the submitted address, retain map candidates, mark the selected structure, and record source dates. The deciding factor is confirmed project identity: a standardized address or plausible map pin alone cannot tell the designer which roof the customer means.

Last updated: November 2026

SurgePV publishes this post and sells solar design software.

A clean roof model of the wrong warehouse is still the wrong model. The error can begin with an ordinary address that points to a driveway, a parcel center, a leasing office, or one structure among several. By the time a polished three-dimensional roof appears, the original uncertainty has become much harder to see.

An address-to-roof-model workflow controls that conversion. It preserves what the requester supplied, separates postal cleanup from map matching, confirms which site and building the project concerns, records the source and age of remote data, and gives every exception an owner. The model then enters design work with an explainable identity and release state.

This workflow is narrower than a complete scalable solar design workflow. It stops before structural, electrical, code, permitting, utility, procurement, and construction decisions. It also differs from a customer-facing address-to-concept marketing workflow, which owns what an early concept may communicate. Here, the reader is the person who must make the address, building, source, and model handoff reviewable.

Start the model with the right building

Bring a marked site image and source packet to a demo of SurgePV’s roof-modeling workflow.

Book a Demo

Checking cost first? See the SurgePV pricing page.

What is an address-to-roof-model workflow?

An address-to-roof-model workflow is the controlled path from a submitted location to a versioned roof-geometry record for a stated project use. It keeps postal address, geocode, site, building, remote-data source, model revision, reviewer, assumptions, and exceptions distinct, so a plausible map response cannot quietly become an approved project identity.

The distinction among those records matters. A postal address helps mail or delivery systems describe a location. A geocode associates address input with coordinates. A site can contain several buildings, parcels, entrances, meters, tenants, or ownership interests. A roof model represents geometry selected for some purpose. These objects can refer to one another without being interchangeable.

In the United States, USPS Publication 28 is a postal-addressing standards source covering delivery-address lines, formats, components, standardization, maintenance, correction, updates, output, deliverability, abbreviations, and address types. That authority supports consistent address handling within its scope. It does not identify the solar building, parcel, meter, owner, site condition, or eligible project.

The Census Geocoder documentation defines geocoding as taking an address and returning an actual or calculated latitude and longitude. It says supplied address parts affect possible granularity and describes the public service’s geography. A coordinate response is therefore a useful lookup record, not proof that a designer has found the requested roof.

Treat the workflow as a chain of controlled assertions:

Record Question it answers What it cannot prove by itself
Submitted address What did the requester enter? Correctness, completeness, or project identity
Standardized address How did an address process represent the parts? Intended building, parcel, customer, or meter
Geocode candidate Where did a lookup place the input? Correct roof, ownership, site condition, or scope
Site record Which wider property context is under review? Which individual structure is selected
Building record Which visible structure is the proposed target? Hidden condition, authority, or engineering acceptance
Model record Which geometry version was created from which inputs? Fitness for every downstream use
Release record Who accepted the model for which stated purpose? Approval outside that purpose

The workflow should make it possible to answer one uncomfortable question quickly: if the customer says, “That is not our building,” can the team show which input produced the selection, who confirmed it, which files used it, and what must be withdrawn? If the answer depends on a designer remembering an old chat message, the record is not controlled.

What record should exist before roof modeling begins?

Before roof modeling, create one project-location record containing the raw address, normalized components, locality and jurisdiction, candidate coordinates, site-context image, selected building identifier, requester confirmation, source provider and dates, intended model use, known changes, open issues, and owners. Missing fields need explicit unknown or hold states rather than blanks that look overlooked.

Keep the original submission unchanged. A corrected or standardized version belongs beside it, with the transformation method and reviewer. Overwriting the raw entry removes evidence that can explain why the lookup behaved as it did. It also makes later reconciliation harder when the customer, CRM, proposal, and design system show different forms of the same place.

Google documents its Address Validation API as identifying components, validating and standardizing an address, and returning a complete address or missing-information indicators. Its example supports customer confirmation, correction, or completion. Those are first-party facts about that service. They do not mean SurgePV uses it, nor do they turn an address response into proof of property or project identity.

Use stable identifiers that do not depend on display text. A building label such as BLDG-A can remain stable when a street suffix changes or the customer uses a campus nickname. Pair it with a site id, project id, and model id. Human-readable names can change; internal lineage should not.

At minimum, the pre-model record needs these groups:

Field group Required fields Accepted state before model request
Submission Raw address, submitter, submitted time, source system Retained exactly as received
Address interpretation Parsed components, standardized form, country or region, method Confirmed, corrected, or visibly incomplete
Location candidates Provider, request string, returned coordinates, match label, response id where available Candidate retained with provenance
Site context Wide map or image reference, visible boundaries, nearby structures, access point Intended site distinguishable from neighbors
Building identity Stable building id, visible label, center reference, customer scope, selection evidence One target selected or a hold opened
Source provenance Imagery provider, capture or processing date when available, quality or resolution note, retrieval date Known values retained; unknowns stated
Workflow purpose Preliminary discussion, model review, design input, or another named use One purpose selected with limits
Exceptions Conflict, uncertainty, owner, due condition, affected uses No material issue hidden in notes

Do not require a false level of certainty. A preliminary lead can proceed with a coarse site reference if its use allows that and the next confirmation is clear. A detailed design handoff needs stronger identity and source evidence. The same field can be acceptable for one purpose and blocked for another.

Customer confirmation should be specific. “Is this correct?” invites a quick yes. Show the wider property, mark the selected roof, and ask whether that structure serves the account and project under discussion. If the answer introduces a second building, shared meter, landlord, tenant, or roof-right question, route it. The designer should not turn a commercial or legal uncertainty into geometry.

How should the address-to-roof-model workflow run?

Run the workflow in ten controlled steps: capture the raw submission, parse without overwriting, normalize within the applicable address system, generate candidate locations, inspect site context, select and label the building, qualify source provenance, issue a bounded model request, review geometry for the stated use, and release a version with assumptions and successor rules.

Each step should have an input, actor, exit condition, and exception path. A fast service can perform several steps in one interface, but the records should remain distinguishable. Otherwise a team cannot tell whether a later correction changed the address, coordinate, chosen building, source dataset, geometry, or release status.

  1. Capture the submitted location. Store the raw address, submitter, source system, time, project id, and any customer-supplied building description. Do not clean the only copy.
  2. Parse the address into components. Separate the fields your market and address system actually use. Mark missing or ambiguous elements instead of filling them from memory.
  3. Create a normalized candidate. Apply the chosen address standard or service, retain its provider and response, and show the difference from the submission. Send material changes back for confirmation.
  4. Generate location candidates. Record every relevant returned coordinate and label, the exact request string, provider, benchmark or version when available, and retrieval time. Do not keep only the winning pin.
  5. Inspect the wider site context. Zoom out far enough to see adjacent parcels, campuses, access roads, duplicated structures, and neighboring roofs. Compare the candidate with project notes and customer scope.
  6. Select and label the target building. Assign a stable building id, mark the structure on a context view, state why it was selected, and identify the person or evidence that supports the choice.
  7. Qualify the model sources. Record imagery and elevation source, available capture or processing dates, quality signals, coordinate reference, units, occlusion, and visible site changes. Leave unavailable fields unknown.
  8. Issue a bounded model request. State the target building id, requested geometry, intended use, exclusions, required metadata, known obstructions, source hierarchy, and stop conditions.
  9. Review the returned geometry. Confirm identity first, then orientation, scale, roof boundaries, planes, elevations, obstructions, and material uncertainty at the resolution required by the stated use.
  10. Release and control the version. Record model id, revision, author or system, reviewer, purpose, accepted evidence, assumptions, open issues, blocked uses, downstream recipients, and the rule for superseding the file.

The model review in step nine should link to a deeper solar roof-model checklist. This article decides whether the correct building and evidence entered the modeling queue. The checklist decides whether the returned geometry is reviewable. Combining both into one checkbox makes each less reliable.

Remote generation also needs a visible limitation. Google says its Solar API methodology uses imagery, maps, three-dimensional modeling, nearby structures and trees, sun position, and weather. These statements describe Google’s method, not every platform. For your own project, retain source dates and compare the returned geometry with current evidence; a generated model is not a site observation.

At release, send the model with a short status header. A reviewer should not have to open metadata panels to learn that the building was customer-confirmed, the imagery date is unknown, a roof extension is suspected, or the file supports preliminary layout only. Put material constraints where a downstream user will see them.

How should ambiguous addresses and conflicting sources be handled?

Ambiguity belongs in an issue queue, not inside a guessed building selection. Preserve every candidate, name the conflict, state which downstream uses are affected, assign the person authorized to resolve it, request the smallest useful evidence, and close the issue with a dated disposition. If identity remains uncertain, hold the model request or restrict its use visibly.

Ordinary address and site conditions create predictable exceptions. A rural address may point to a long driveway. A commercial address may identify a reception building while the project concerns a warehouse behind it. Several tenants can share one street number. A newly constructed roof may be missing from imagery. A customer may use an informal building name that never appears in a map database.

Do not choose a winner because one source looks more official. Each source has a purpose and date. A postal record can describe delivery. A map service can return a candidate location. A customer can identify the building they mean while being unable to prove ownership or electrical scope. A site survey can observe current physical conditions without settling a contract question. Reconciliation requires the evidence appropriate to the disputed field.

Use an exception taxonomy that tells the next owner what kind of problem exists:

Exception type Example Immediate treatment Resolution owner
Incomplete address Missing unit, locality, or site descriptor Request the missing component; retain raw input Intake owner
Multiple match Several plausible coordinates or labels Keep candidates and inspect wide context Location reviewer
Wrong structure Pin falls on a neighboring or administrative building Hold target selection and request marked context Project owner
Multi-building site One address covers several roofs Create building ids and bind scope to one or more Customer-facing owner plus design coordinator
Source conflict Address, imagery, plan, and customer note disagree State the field in conflict and controlling decision needed Authorized field owner
Stale or uncertain imagery Addition, reroof, tree change, or unknown date Restrict model purpose and request newer evidence Model reviewer
Hidden condition Electrical, structural, access, or interior fact is unavailable remotely Keep outside roof-model approval Qualified reviewer or field team
Unsupported change Someone drags a pin or edits a boundary with no basis Reject the edit and restore traceable lineage Document controller

Ask for the smallest evidence that can resolve the decision. A marked screenshot may identify the intended warehouse. Recent site photographs may confirm an addition. A plan or survey may resolve scale or boundary. A field visit may be needed when remote evidence cannot support the next use. The solar site survey process owns field collection and confirmation; do not disguise that work as map cleanup.

Keep correction history. If a model request first targeted BLDG-A and later moves to BLDG-C, retain both states, the reason, affected outputs, and recipients. Silent replacement leaves old proposals, layouts, screenshots, and discussions active with no visible warning.

One source can disagree with another without either being defective. Google documents that its building insights and geocoding results can differ because the services use different building and address information. That first-party limitation supports retaining both lookup and building-result provenance. It does not tell a private team which result is correct.

Postal format
USPS address standardization
Coordinates
Census geocoding response
Building data
Google Solar API insights

Sources: USPS Publication 28, Census Geocoding Services documentation, and Google Solar API building-insights documentation linked in this post; checked November 6, 2026. These records answer different questions.

Source Documented purpose or behavior Handoff implication
USPS Publication 28 Postal address formats and components Preserve the formatted address separately from building identity
Census Geocoder Returns coordinates calculated along an address range Inspect the site before selecting a roof
Google Solar API building insights Uses building information that may differ from geocoding results Retain the provider and response for each selected building

The handoff implications are this article’s workflow recommendations. They do not imply that SurgePV uses these services.

Key Takeaway

Address cleanup, coordinate lookup, and building selection are separate decisions. Keep their evidence distinct so a wrong target can be traced and corrected.

Which quality gates should control a roof-model release?

Use separate gates for address completeness, location-candidate provenance, site context, building confirmation, source currency, model identity, geometry review, exception disposition, purpose limits, and downstream version control. A gate may pass, pass with a visible condition, or hold the affected use. One generic approved status hides which decision was actually reviewed.

The first gate is identity, because perfect geometry cannot recover a wrong target. The second is provenance, because a reviewer needs to know where the address, coordinate, imagery, and model came from. Geometry follows. Release scope comes last, after the team understands what the evidence supports.

Do not let one green icon imply every use. Create a short status vocabulary:

Release state Meaning Permitted treatment
Captured Raw request retained; interpretation not complete Intake work only
Candidate Address or coordinate candidate exists Context inspection; no target claim
Building identified Target structure selected with stated evidence Bounded model request
Model draft Geometry returned; review incomplete Internal review only
Reviewed for purpose Named reviewer accepted it for one stated use Only that use, with conditions
Held Material identity, source, geometry, or authority issue remains Affected downstream use blocked
Superseded A successor revision controls current work Retain lineage; prevent active issue

For each gate, record the reviewer, date, evidence, outcome, limitation, and affected uses. A field marked unknown can still pass an early gate if the purpose tolerates it. The same unknown may hold detailed design. This is more useful than pretending every project follows one universal confidence threshold.

Review source dates and context before geometry. Imagery may predate a roof addition or removal. A provider’s processing date and capture date can mean different things, so preserve the field name rather than reducing both to “date.” If only retrieval date is known, say so. Do not infer image freshness from interface styling.

The geometry gate should inspect the returned building id and context view before zooming into ridges. Then compare orientation, scale, boundaries, plane splits, height relationships, and visible obstructions with the retained evidence. Escalate the roof when its conditions warrant a more detailed design review. That adjacent article owns geometry and roof-condition escalation, while this gate owns whether the workflow routes it.

The release gate must list blocked uses. “Preliminary” alone is too vague. State whether the model may support internal feasibility discussion, a customer conversation, an initial layout, detailed design input, or another defined purpose. Name the reviews still required before stronger uses.

Carry building identity into design review

Explore the modeling and proposal steps your team needs after the target roof has been confirmed.

Book a Demo

Checking cost first? See the SurgePV pricing page.

Pro Tip

On a multi-building site, send a wide image with stable building labels. Ask the requester to mark the intended roof before the model enters the queue.

Who owns each address-to-roof-model handoff?

Ownership should follow decision authority: intake preserves the submitted record, a location reviewer reconciles address and map candidates, the project owner confirms customer and building scope, the modeler records source and geometry, a qualified reviewer handles technical decisions, and document control governs release and supersession. Software can carry records; it cannot inherit unstated authority.

Do not make the modeler the default owner of every upstream uncertainty. A designer can notice that a map pin and customer note disagree, but may not be authorized to decide which tenant, meter, lease area, or building belongs in the contract. The useful action is to open a precise issue and restrict work that depends on it.

Decision Responsible role Required evidence or record Handoff output
Preserve submitted address Intake owner Raw form, submitter, source, time Immutable submission record
Interpret address components Location or data owner Applicable format and response Normalized candidate plus differences
Select intended site and building Project owner with customer-facing evidence Marked context and stated scope Stable site and building ids
Qualify remote sources Modeler or geospatial owner Provider metadata and visible limitations Source-provenance record
Create roof geometry Modeler or system Bounded model request Versioned model draft
Review geometry for purpose Design reviewer Source packet, geometry checks, issue list Accepted, conditioned, or held state
Decide structural or electrical matters Qualified responsible party Project-specific evidence and method Separate technical disposition
Control release and successor Document controller or operations owner Revision, recipients, approval scope Current release register

NASA’s technical-data-management reference covers identification and control, retrieval metadata, access at the point of use, reusable formats, origin and change responsibilities, storage, procedures, tools, and training. NASA policy does not govern a solar company. The cited categories provide a useful analogy for treating the roof model as controlled technical data rather than an attachment that floats between inboxes.

Set response rules for exceptions. The issue owner needs a due condition, not a decorative due date. Examples include “customer marks the intended structure,” “current site photograph received,” “plan dimension reconciled,” or “qualified reviewer records no impact.” A due condition describes what closes the issue.

Make the receiving role reject incomplete handoffs. A model request with no building id, no context image, and no intended use should return to intake. That may feel slower than drawing immediately. Record the unresolved building identity before generating detailed geometry, rather than making a silent selection that later reviewers cannot reconstruct.

Illustrative workflow: one address, three visible buildings

This is a visibly labelled illustrative workflow, not a customer case, measured result, or recommendation. Assume an intake record contains one commercial street address and a note saying “main warehouse.” The context view shows an office near the road, a large central warehouse, and a smaller rear storage building. No building id, meter reference, or marked roof was supplied.

The team retains the raw address and note. It creates a normalized address candidate, records the returned coordinate, and notices that the pin falls on the front office. Instead of moving the pin silently to the largest roof, the location reviewer creates SITE-01 with three candidate structures: BLDG-A for the office, BLDG-B for the central warehouse, and BLDG-C for rear storage.

The project owner sends the customer a wide context image with the three labels and asks which building serves the project under discussion. The customer marks BLDG-B and mentions that a small roof extension was added after the available overhead image. The record now contains a supported target and a source-age warning. It still contains no conclusion about ownership, electrical service, roof condition, structure, or project eligibility.

The model request names SITE-01 / BLDG-B, includes the marked context image, states that the extension is unresolved, and limits the first model to internal geometry review. The modeler retains imagery and processing metadata when available, models the visible roof, marks the extension area unknown, and returns a revision with a source note. The reviewer confirms that the correct structure was modeled, but holds any use that depends on the extension dimensions.

Recent photographs or field evidence later resolve the extension. The modeler creates a successor revision rather than overwriting the first file. Document control identifies the new revision, reason, affected outputs, reviewer, and recipients. If an early screenshot reached sales, the project owner knows it needs replacement.

The example is useful because nobody performed a heroic investigation. The team simply refused to compress five different questions into one map pin. Address format, coordinate candidate, building identity, remote source, and geometry each received its own record and owner.

Copy-ready address-to-roof-model control record

Use this as a worksheet, ticket template, or review record. Adapt the fields to the markets, data sources, and authority structure your organization actually uses. A blank should mean “not reviewed” only if that state is explicit. Prefer confirmed, corrected, unknown, not applicable, conditioned, held, or superseded.

Project and submission

  • Project id:
  • Raw submitted address:
  • Submitted by and source system:
  • Submission time:
  • Customer or project description:
  • Intended market and jurisdiction:
  • Requested model purpose:

Address interpretation

  • Parsed address components:
  • Normalized address candidate:
  • Standard or provider used:
  • Response or transaction reference:
  • Difference from raw submission:
  • Confirmation owner and status:

Location and site context

  • Candidate coordinate or coordinates:
  • Lookup provider, request, and retrieval time:
  • Returned match label and granularity:
  • Wide context image reference:
  • Adjacent or duplicate structures noted:
  • Site id:
  • Site-context reviewer:

Building selection

  • Candidate building ids and labels:
  • Selected building id:
  • Selection evidence:
  • Customer or project-scope confirmation:
  • Electrical-service or ownership question routed to:
  • Building-selection status:

Source and model provenance

  • Imagery provider and layer:
  • Capture date, processing date, and retrieval date as separate fields:
  • Elevation or surface source:
  • Coordinate reference and units when applicable:
  • Quality, resolution, shadow, foliage, snow, or occlusion note:
  • Known site changes:
  • Model method, author or system, and created time:
  • Model id and revision:

Review and release

  • Identity review outcome:
  • Geometry review outcome:
  • Intended-use acceptance:
  • Assumptions and unknowns:
  • Open issue ids:
  • Blocked downstream uses:
  • Reviewer and date:
  • Released recipients:
  • Superseded revision and successor rule:

Maintain a companion issue queue:

Issue id Field in conflict Evidence available Evidence requested Owner Due condition Affected uses Disposition and date
Example only Building selection Address and context view Requester-marked structure Project owner Marked structure returned Model request Open

The copy-ready record should live where the work happens. A spreadsheet can work if access, revisions, and links are controlled. A project platform can work if fields remain exportable and visible to reviewers. The medium matters less than whether another person can reconstruct the decision without asking who remembers the map search.

Where SurgePV fits and where software stops

Evaluate the offered SurgePV configuration against the roof-model and downstream design outputs needed by your team. SurgePV’s published scope includes 3D roof modeling, array layout, shading analysis, energy-yield and financial modeling, electrical workflow support, bill-of-materials output, and proposal generation. Native address lookup, property verification, and imagery integrations are outside the capabilities verified for this article.

In a solar design workflow, test whether the offered tools retain project identifiers, selected building references, geometry revisions and downstream dependencies. Record manual steps and export limits alongside demonstrated functions. Check the source provider’s storage, display, attribution and reuse terms before caching imagery or derived data; keeping an audit record does not grant data rights. Limit address-linked personal data to the approved purpose and retention policy.

Software cannot establish unstated customer intent, ownership, roof rights, electrical-service scope, hidden construction, structural condition, legal rights, code compliance, permit acceptance, utility approval, or construction readiness. It also cannot turn old or incomplete source data into current field evidence. Those questions belong to the responsible project roles and external authorities.

Results depend on source data, assumptions, equipment models, configuration, and review. Outputs support workflows but do not replace approval by the responsible engineer, authority, lender, insurer, utility, or another accountable party. If a model feeds energy, financial, electrical, materials, or proposal records, preserve its purpose and unresolved conditions through those consumers rather than dropping them at export.

This boundary is why the instant roof model remains a first draft. Rapid geometry is useful. The workflow earns trust by showing exactly what was known before generation, what the model added, what a reviewer accepted, and what still needs evidence.

Frequently Asked Questions

Is a standardized postal address enough to start a solar roof model?

A standardized address can improve the consistency of the address record, but it does not prove which building, parcel, meter, customer scope, or roof belongs in the solar project. Preserve the submitted and standardized forms, inspect the wider site, confirm the intended structure, and record unresolved identity questions before requesting a model.

What should happen when a geocode lands on the wrong building?

Keep the returned coordinate as a candidate rather than editing it into apparent truth. Record the provider, request, response, and mismatch; identify the intended structure from suitable project evidence; assign an owner; and rerun or manually place the building reference only after the correction and its basis are documented.

How should a solar team handle one address with several buildings?

Create a site record plus a separate stable identifier for every candidate building. Show a wide context view, label each structure, bind the requested electrical and customer scope to the intended building, and keep unselected structures visible. If the requester cannot identify the target, hold modeling instead of choosing the largest or nearest roof.

Does a roof model release approve the site for permitting or construction?

No, a roof-model release should state its intended use, evidence, revision, assumptions, unresolved issues, and required next review. It does not prove ownership, structural condition, electrical suitability, code compliance, permit acceptance, utility approval, procurement release, or construction readiness. Those decisions remain with responsible people and authorities using suitable evidence.

Can software guarantee that the correct roof was modeled?

No software response alone proves that the selected roof matches the customer’s intended project. It cannot know an unstated customer scope, resolve every conflicting source, inspect hidden site conditions, or assume professional and external authority. The workflow still needs identity confirmation, exception ownership, model review, and controlled release.

A roof model needs an identity before it needs detail

The expensive mistake is often boring at the start. A street address points somewhere plausible, the largest roof looks obvious, and nobody wants to interrupt the queue with a question that feels administrative. Geometry gives the choice visual authority before the choice has earned it.

Keep the chain visible. Preserve the submission. Treat normalization and geocoding as candidate-making steps. Confirm the site and building. Record the source and its limits. Route conflicts to people who own those decisions. Review the returned model for one named purpose, then control its successors and recipients.

That record gives later reviewers a traceable answer to where this roof came from and why it was selected. Bring the marked building and source packet to a guided design walkthrough to examine the next modeling step.

Sources

Primary research and reference material used for this desk-research article.

Where this fits

This article is part of SurgePV's Solar Business & Operations hub, which works through the topic from first principles to the decisions a project team actually has to make.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free Demo

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.